The project started in 2012 and completion is expected in 2014. This is a building with basement, ground floor, first floor and attic, total area 1.650 m2.
The building incorporates bioclimatic elements such as proper orientation, existence of large transparent surfaces to the south, extensive sun shading, natural ventilation, use of double glazing coated membrane low emissivity (low e), installation of ceiling fans. Furthermore, the cooling system is heating with geothermal heat pump and coil units. For the operation a vertical ground heat exchanger is constructed.