2nd Nursery Anargyron

Project Description

The project started in 2012 and completion is expected in 2014. This is a building with basement, ground floor, first floor and attic, total area 1.700 m2. The building incorporates bioclimatic elements such as proper orientation, existence of large transparent surfaces to the south, extensive sun shading, natural ventilation, night ventilation in summer, using double glazing coated membrane low emissivity (low e), installation of ceiling fans, solar panels and so.

Furthermore, the cooling system heating and hot water, is done with geothermal heat pumps and water terminal units. For their operation, a vertical ground heat exchanger was constructed. Also, for the ventilation exchangers air / air with integrated water element was used. Finally, all the facilities of the building (ventilation, lighting, air conditioning, fire detection, etc.) are controlled by a central control system (BMS).

Project Details

  • Status: completed
  • Year: 2012