4th Elementary School in Keratea and 4th Kindergarten - Multipurpose Room - Fitness

Περιγραφή έργου

The school complex was carried out in 2009-2012. The complex includes nursery floor 450 m2, elementary school with a basement, ground floor and first floor, total area 3.500 m2 and gymnasium total area 1.500 m2.

For the conditioning of the gym, air conditioning unit was installed on the roof that works in conjunction with the boiler or cooler depending on the season. All of the air conditioning system is controlled by BMS.

Λεπτομέρειες έργου

  • Status: Completed
  • Year: 2009-2012