3rd early kindergarten Anargyron

Project Description

The project was implemented in 2007-2008. This is a building with basement, ground floor, first floor and attic, total area 1.100 m2. For heating chiller and boiler has been installed, both working with water terminal units (fan coils).

The building is designed with bioclimatic data as the correct orientation, with large transparent surfaces to the south, extensive sun shading, natural ventilation, night ventilation in summer, using double glazing coated membrane low emissivity (low e), installation of ceiling fans, green roof construction etc.

Project Details

  • Status: Completed
  • Year: 2007-2008